Join us as we build a lean-to shed. In this series we take you along our journey as we built a custom shed.
This post is all about the floor of the shed.

BUILDING THE SHED FLOOR (SHED SERIES: PART 2)
The floor of the shed was probably the easiest part of the whole build.It came together in just a few hours.
↑ ↑ ↑ PIN IT ↑ ↑ ↑
Below are all 7 articles included in this series. Links will be added as the posts go live.
Introduction & Planning
Building the Floor (This post)
Building the Walls
Roof & Overhang
Doors & Finishing
Shelving
Cost Analysis
BUILDING THE SHED FLOOR
The goals for our shed had taken shape and the first added expense to the shed occurred.
We wanted to be able to put ATV's in the shed and the initial thought of being able to have a 2x4 floor and 16” on center spacing did not appear to be able to handle the extra weight of an ATV.
Due to this, the floor was over engineered to hold any weight we wanted to put on it.
We elected to use 2x6 pressure treated lumber with 12” on center spacing to ensure the floor could handle the weight and the 8’ span. So the floor was laid out and nailed.
After the floor was nailed together, I needed to ensure it was level. The slope of the driveway ended up being the exact height of 4x4 pressure treated board. So the street facing side of the shed has the 4x4 and the house side is on the cement driveway.
The flooring was nailed down and the shed floor was complete.
Next up: Building the Shed Walls
MORE DIY PROJECTS
- How to Build a Drying Rack for the Laundry Room
- DIY Karate Belt Display Rack
- How to Build a Jewelry Organizer
Don't forget to pin it!!





0 comments